Connection Schedule – Read Loading conditions

Analyze load transfer before blindly applying connections.

Here is a markup from the engineer, which is right. The load from the UB350 beam is not transferred to SC7. Hence 4 bolts not required.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *