The Parramatta River is an intermediate tide-dominated, drowned valley estuary located in Sydney, New South Wales, Australia.
Tek1 has done a great job in detailing the bridge and delivering the drawings on time.
Also suggesting them with any issues that could possibly occur during erection on before hand saving thousands of dollars during detailing stage.
Try construct a new building is easier compared adding members to an existing members. We could face lot of issues on site. Tek1 has done it efficiently with skilled team members.
The existing site condition has made the Tek1 to propose lot of design changes which saved thousands of dollars during erection. Also one such thing, we provided them with a “drill template” so drilling on the members were done with ease and saved a lot of time, cost and man-hours.
Blog by Bharath – Tek1 Pvt Ltd.
Visit www.tek1.com.au for further enquiries.
Leave a Reply