Erection Issue Eliminated Through Suggested Changes in the Splice Connection During Detail Engineering
Issue Identified During Detail Engineering
- During detail engineering, it was identified that the design specifies both-side web plates, with shop weld on one side and field bolts on the other.
- This would have created a field erection issue, as the shop-welded web plate on both sides prevents secondary beam placement.
Proposed Solution: Fully Bolted Connection
- Use bolted connections on both sides instead of welding one side.
- This allows the web plate to be shipped loose, making field installation easier.
- At the site, the secondary beam can be placed first, followed by the web plate installation and bolting.
- Factory-drilled holes ensure precise alignment and better quality.
- Eliminates on-site welding hazards and inspection issues.
Client Approval
- The client accepted the suggestion due to its practical benefits and ease of installation.
- The change improves efficiency, cost-effectiveness, and safety.
Conclusion
- Switching from welded-bolted to fully bolted improves constructability.
- Ensures stronger, safer, and more efficient structural connections.
- Small design changes can greatly impact project success.