When modeling bigger project sometimes the Reference material like IFC, CADD layout do not match with the design documents and could cause conflict. As a detailer, Verify these conflicts with the project manager and get clarified before providing with the Fabrication and Erection drawings. Such measure when done prior could save lot of money and time for the client and the Erector.
Blog by Bharath – Tek1.
Visit www.tek1.com.au for further enquiries.
Leave a Reply