This was a complex project, but we successfully delivered it. Our scope included the balustrade around the bridge, which needed to be provided in multiple panels. By utilizing advanced modeling techniques, we were able to complete it within a significantly shorter timeline.

Since the structure is above the sea, we provided several cost-saving ideas for both erection and fabrication to optimize the process.

This was drawn by Tek1 (Vignesh), if you want shop drawings for a project you are working on, feel free to call Koshy on: (03) 9560 6397.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *