- The rigging detailed diagrams are shown on shop drawings. (Ref Fig.01,02 & 03)
- The rigging diagrams are designed based on the precast panel profiles.
- It is indicating the lifting point position of precast panels for both factory and site.
- Erection engineer will be approved the rigging diagram details.
- The site people are preplanning to lifting the precast panels for erection.
- It is indicating the demolding lifting points. So, the factory people will aware while lifting the panels on factory.
- It is designed to distribute loads equally between all anchors in precast components such as walls, beams or flat slabs and etc.
- It is also used for loading and unloading the panel while transportation.
- The lifting accessories may be in the form of cables, hooks and etc.
- Many accidents and failures will be avoided with the help of rigging diagram.
- The time delay of the lifting to be reduced.
(SAMPLE RIGGING DIAGRAMS FOR REFERENCE)
Leave a Reply