- Extraction of individual Bubble deck Slab from Layout to Sheet
- Calculation for Volume and weight for minimum slab pour in Factory
- Placement of Lifters on the Min slab pour to lift the Min slab after pouring and curing form the factory
- Reinforcement setout panel copied from the Source panel
- Reinforcement Arrangements are done based on the Original Slab depth value given to the copied panel
- Trimmer bars If the panel has Profile breaks and column Opening
- Dimensioning of Panel ball set out for Panel Profile, Balls and cast in components present in the Min Slab Pour
- Dimensioning of Reinforcement set out for Slab cover from the start of reo bar. Reinforcement setout Point selection and dimension for Truss arrangement.
- Heading Notes for Panel ball set out with finish notes and Reinforcement setout
- Notes for Block out and Penetration in Panel Ball setout
- Notes for Trimmer Bar , Splice Bar and Loose U Bars in Reinforcement setout
- List part for the cast in Components present inside the min concrete Slab
Thanks to Koshy, Ben and Venkat for Supporting and guidance .
Leave a Reply