Bubbledeck Slab Shop Drawing

  • Extraction of individual Bubble deck Slab  from Layout to Sheet
  • Calculation for Volume and weight for  minimum slab pour in Factory
  • Placement of Lifters on the Min slab pour to lift the Min slab after pouring and curing form the factory
  • Reinforcement setout panel copied from the Source panel
  • Reinforcement Arrangements are done based on the Original Slab depth value given to the copied panel
  •  Trimmer bars If the panel has Profile breaks and column Opening
  • Dimensioning of Panel ball set out for Panel Profile, Balls  and cast in components present in the Min Slab Pour
  • Dimensioning of Reinforcement set out for Slab cover from the start of reo bar.  Reinforcement setout Point selection and dimension for Truss arrangement.
  • Heading Notes for Panel ball set out with finish notes and Reinforcement setout
  •  Notes for Block out and Penetration in Panel Ball setout
  • Notes for Trimmer Bar , Splice Bar and Loose U Bars in Reinforcement setout
  • List part for the cast in Components present inside the min concrete Slab

Thanks to Koshy, Ben and Venkat for Supporting and guidance .


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *