Category: Steel Detailing Blog
-
-
William street Privacy screens
Tek1 has successfully completed the commercial project for the reputed organisation in Australia. The scope of work involves providing privacy screens and their supports. We have encountered challenges with the aluminum screen bends during the project. Initially, we received instructions that each screen should have a bend in all four directions, which we modeled and…
-
Millar Warehouse
Tek1 has successfully completed the industrial project for the reputed organisation in Australia. This project does not have any structural design drawings. Instead, the client has provided sample design drawings. Therefore, we need to coordinate our structural design with the architect’s drawings. We need to provide structural support for an overhead crane. TEK1 has provided…
-
Glenfern Lifestyle park
Tek1 has successfully completed the project for the reputed organisation in Australia . Lots of timber connections involved with steel in this project. TEK1 provided all the supporting members for timber.Client is happy with the connections that we have provided which is not in their design.
-
M4 Cut & Cover – Tunnel road ceiling support
Tek1 has successfully completed the industrial project for the reputed organisation in Australia . We have provided a ceiling support steel for the tunnel road. One of the main challenges we faced in this project was site measurement. We had to provide frames between two walls, and modeling using design dimensions was not feasible. As…
-
Preston tram shed
Tek1 has successfully completed the industrial project for the reputed organisation in Australia . Lots of site measure involved in this project. TEK1 coordinated with builder & surveyor to finish the project without any error. Client is happy with our work.We are always focus on the client requirements.
-
Add Bent Plate or Welded Plates
For the fabricator, bent plates are more expensive to produce in low volume. So when you want a bent plate, in low volume ( less than 50 pieces, go for welded plates). More than that please raise an RFI. When you are detailing please note this one.
-
St. Benedict’s Stage 7 Hall, Oran Park
Raj (Arokiaraj Arputharaj) St. Benedict’s Stage 7 Hall, Oran Park, is a multipurpose hall structure. St. Benedict’s Catholic College was opened in 2011 on a greenfield site in Sydney’s south west suburb of Oran Park. There are seven stages of construction work listed below. Technology and Applied Studies (TAS) food technology covered outdoor learning science staff…
-
Bega Tafe – Stage 2
Raj (Arokiaraj Arputharaj) Bega Tafe-Stage 2 structure is Multi Trades Hub. The new 2-level Multi Trades Hub adjoins the existing TAFE NSW Connected Learning Centre and incorporates workshops for automotive, engineering, carpentry, and bricklaying disciplines. Also included are general learning spaces, specialist facilities that support the delivery of aged care, disability courses, and early childcare,…