Category: Steel Detailing Blog
-
Medical centre stair
Tek1 has successfully completed the stair project for the reputed organisation in Australia . There is not enough connection details in the initial design drawings. Tek1 has proposed most of the connections & client accepted it. We have considered all the erection issues and provided the most suitable connections.
-
Oxford school-Paddington
TEK1 Successfully done this Oxford school. Detailed by Vignesh & Shahul
-
Traffic Railings
Author: Pon Dhileepan A new bridge on the Crescent right turn grade sepration over the Crescent and city west link at Lilyfield and Annandale at 4.6km west of Sydney Rozelle interchange and wester harbour tunnel is built for the NSW Government. This bridge is more than 400m in length with approach & departure ramps. RHS…
-
Esplanade Brighton canopy
Tek1 has successfully completed the canopy project for the reputed organisation in Australia . Client wants us to change the connection design for roof steel. We had propose the connection details & client happily accept out proposals.
-
Buxton Reservoir school
TEK1 Successfully done this Reservoir school. Detailed by Vignesh & Shahul