Category: Steel Detailing Projects
-
Lygon court plaza stair
TEK1 finished this stair project. TEK1 not only model stairs as per design.We will check the stair design against the standards. We have checked this stair design against AS1428.
-
Millbrook Maintenance Stair
Author : Ramakrishnan. L TEK1 recently did the 5-different types of railway Maintenance stairs with varying chainage. We are using our own macros to Model & detail these stairs pretty easier. Please refer to below for few model snaps
-
Macquarie link bridge
TEK1 done a detailing work for the link bridge.The complication of this project is site measure. We have to co ordinate with the existing building site measure to finish this work.Most of the structural members are connected to the existing concrete.We have coordinated with site surveyor & got the dimension we want to connect the…
-
7, Callen Street
Author: Pon Dhileepan This single storey residential house of dwelling area 294m2 is built in Seymour, Victoria. This building is neither entirely load bearing structure nor framed structure. It is a composite structure. The roof purlins & beams are supported by steel columns at some area and by block walls at other area. The initial…
-
Concorde Park (Lot 33-35)
Author: Ramakrishnan .L Tek1 handled both the precast and steel detailing, obviating the need for you, the client, to coordinate between the two trades. This allows us to expeditiously sort out RFIs / design issues – which means faster drawings. Check out the images:
-
NEW MULTI DWELLING RESIDENTIAL DEVELOPMENT
Location : 31 VALLEY FAIR DRIVE, NARRE WARREN TEK1 Completed this multi-dwelling residential project with out any hitch.
-
Kiama Awning
Came together without hitches. Short timelines.