Category: Steel Detailing Projects
-
Millar Warehouse
Tek1 has successfully completed the industrial project for the reputed organisation in Australia. This project does not have any structural design drawings. Instead, the client has provided sample design drawings. Therefore, we need to coordinate our structural design with the architect’s drawings. We need to provide structural support for an overhead crane. TEK1 has provided…
-
Glenfern Lifestyle park
Tek1 has successfully completed the project for the reputed organisation in Australia . Lots of timber connections involved with steel in this project. TEK1 provided all the supporting members for timber.Client is happy with the connections that we have provided which is not in their design.
-
M4 Cut & Cover – Tunnel road ceiling support
Tek1 has successfully completed the industrial project for the reputed organisation in Australia . We have provided a ceiling support steel for the tunnel road. One of the main challenges we faced in this project was site measurement. We had to provide frames between two walls, and modeling using design dimensions was not feasible. As…
-
Preston tram shed
Tek1 has successfully completed the industrial project for the reputed organisation in Australia . Lots of site measure involved in this project. TEK1 coordinated with builder & surveyor to finish the project without any error. Client is happy with our work.We are always focus on the client requirements.
-
St. Benedict’s Stage 7 Hall, Oran Park
Raj (Arokiaraj Arputharaj) St. Benedict’s Stage 7 Hall, Oran Park, is a multipurpose hall structure. St. Benedict’s Catholic College was opened in 2011 on a greenfield site in Sydney’s south west suburb of Oran Park. There are seven stages of construction work listed below. Technology and Applied Studies (TAS) food technology covered outdoor learning science staff…
-
Life Saving Facility – Smiths Beach
Author: Pon Dhileepan This was my first project as a modeler, completed in January 2018. A circular structure steel structure surrounded by timber battens was modelled & detailed for Smiths Beach, Yallingup WA. Completed site image is attached at the bottom The structure consists of a bottom ring, a body made as circular cage &…
-
Bega Tafe – Stage 2
Raj (Arokiaraj Arputharaj) Bega Tafe-Stage 2 structure is Multi Trades Hub. The new 2-level Multi Trades Hub adjoins the existing TAFE NSW Connected Learning Centre and incorporates workshops for automotive, engineering, carpentry, and bricklaying disciplines. Also included are general learning spaces, specialist facilities that support the delivery of aged care, disability courses, and early childcare,…
-
4 Schofield St, Essendon
Raj (Arokiaraj Arputharaj) 4 Schofield Street is a multi-residential development structure. The structure contained five dwellings. TEK1 raised multiple RFIs with a proposal. So the design got revised according to the RFIs. The client responded to TEK1 RFIs quickly. The project was completed quickly by our team.
-
Residential renovation project
Tek1 has successfully completed the residential project for the reputed organisation in Australia . Lots of timber connections involved with steel in this project. TEK1 provided all the supporting members for timber.Client is happy with the connections that we have provided which is not in their design.