Category: Projects

  • SPORTS_PAVILION

    Sport Pavilion is a simple project perfectly timed and done. The project was delivered on time. Few challenges faced in this project is the location of Tie beam. The beam seems be running where a full height window appears. Which affects the aesthetic view of the building. We informed the clients in prior to detailing…

  • Bacchusmarsh

    Sometimes in the process of converting a 2D design drawings to 3D model, we may face many issues. Like the conflict in design documents , clash in the structure and so on. Such issues can be resolved at the preliminary stage itself by the detailer and helps the client to have a complete view of…

  • CCCS Stair

    When modeling bigger project sometimes the Reference material like IFC, CADD layout do not match with the design documents and could cause conflict. As a detailer, Verify these conflicts with the project manager and get clarified before providing with the Fabrication and Erection drawings. Such measure when done prior could save lot of money and…

  • Aldi Merumbula

    While detailing we must also consider the miscellaneous items like Gutter, Mechanical units etc. Detailer may ignore such items which could impact in the cost of Erection. We have faced and avoided one such situation such as the Gutter depth when used as specified in the design drawings conflicts with the Architectural recommended height of…

  • ST Benedicts Oran Park

    Sloped roof and canopy makes the Benedicts Oran Park an excellent structure to detail. We must always consider while detailing if any column or member to be placed near a open full height window or open pathway care must be taken and informed the project leads. Refer below examples snip where an column is shown…

  • Bega Tafe

    Bega Tafe is a simple structure. One of the things we have to note down while constructing simple structure is some members can be more than 12 meter long. Standard transportation space available for frame is 12m x 2m x 2m. Any frame or member greater than 12m has to be reported to Project Manager…

  • Extension at 335 Liverpool Road Kilsyth

    When an existing member is located near the new extension never forget to ask the site measurements from the Project manager. It could be of a simple mark-ups explaining things like below snip. Which could save thousands of dollars and a happy client. Sometimes there might be a conflict between the Architectural drawings and Structural…

  • Warnambool_Footbridge

    Warnambool is a city along the Great Ocean Road, in Victoria, Australia. Warnambool Footbridge is a million dollar project done quite efficiently. The cladding work surrounding the bridge made it to be a quite nightmare to the detailers. Several Mark-ups with 3D snips or 3D cad and BIM mark-ups were sent to the client to…

  • PARAMATTA RIVER BRIDGE

    The Parramatta River is an intermediate tide-dominated, drowned valley estuary located in Sydney, New South Wales, Australia. Tek1 has done a great job in detailing the bridge and delivering the drawings on time. Also suggesting them with any issues that could possibly occur during erection on before hand saving thousands of dollars during detailing stage.…