Author: Barath Nagarajan
-
Foyer-Stair
Foyer-Stair is one of the simple structure detailed by Tek1. Find below list of short notes for modeling and detailing stair.Two common code books followed are:AS1428 – Commercial StructureAS1657 – Industrial StructureAlso keep a note on the nosing point must fall on same slope to stair. The thread and riser must be of same length…
-
Richmond Cinemas
Richmond Cinemas is one of the simple structure detailed by Tek1. Tekla could deliver you the design with highest accuracy possible. Any error due to fabrication or in members effected by external factors like weather etc. could be resolved by giving a tolerance to the structural members. This could also save the Erector during erection,…
-
The Entrance
Every project has its time fixed. Sometimes the Project Manager or the client might miss some documents that are useful for detailing. As a detailer we must know when to request and what to request the client if any details or specification sheets that are missing. For example request a site measurement if the new…
-
SPORTS_PAVILION
Sport Pavilion is a simple project perfectly timed and done. The project was delivered on time. Few challenges faced in this project is the location of Tie beam. The beam seems be running where a full height window appears. Which affects the aesthetic view of the building. We informed the clients in prior to detailing…
-
Bacchusmarsh
Sometimes in the process of converting a 2D design drawings to 3D model, we may face many issues. Like the conflict in design documents , clash in the structure and so on. Such issues can be resolved at the preliminary stage itself by the detailer and helps the client to have a complete view of…
-
CCCS Stair
When modeling bigger project sometimes the Reference material like IFC, CADD layout do not match with the design documents and could cause conflict. As a detailer, Verify these conflicts with the project manager and get clarified before providing with the Fabrication and Erection drawings. Such measure when done prior could save lot of money and…
-
Aldi Merumbula
While detailing we must also consider the miscellaneous items like Gutter, Mechanical units etc. Detailer may ignore such items which could impact in the cost of Erection. We have faced and avoided one such situation such as the Gutter depth when used as specified in the design drawings conflicts with the Architectural recommended height of…
-
ST Benedicts Oran Park
Sloped roof and canopy makes the Benedicts Oran Park an excellent structure to detail. We must always consider while detailing if any column or member to be placed near a open full height window or open pathway care must be taken and informed the project leads. Refer below examples snip where an column is shown…