Author: Arokiaraj Arputharaj
-
29 HICKEYS RD, PENRITH
Author: RAJ (Arokiaraj Arputharaj)
-
EARL STREET
Author: RAJ (Arokiaraj Arputharaj)
-
9 TRADE PLACE
Author: RAJ (Arokiaraj Arputharaj)
-
RAAFA POOL EXTENSION
Author: RAJ (Arokiaraj Arputharaj)
-
THE ENTRANCE HOTEL
Author: Raj (Arokiaraj Arputharaj) THE ENTRANCE HOTEL is a hall structure, and TEK1, a dedicated steel detailer, played a pivotal role in its realization. Specializing in All Steels, TEK1 meticulously executed the installation of anchor bolt steel columns, beams, braces, and purlins. As a steel detailer, TEK1 raised multiple Requests for Information (RFIs) along with…
-
ALDI MERIMBULA, 103 MAIN STREET, NSW 2548
Author: Raj (Arokiaraj Arputharaj) ALDI MERIMBULA features a versatile multipurpose hall structure, and TEK1, a dedicated steel detailer, played a pivotal role in its realization. Specializing in All Steels, TEK1 meticulously executed the installation of anchor bolt steel columns, beams, braces, and purlins. As a steel detailer, TEK1 raised multiple Requests for Information (RFIs) along…
-
St. Benedict’s Stage 7 Hall, Oran Park
Raj (Arokiaraj Arputharaj) St. Benedict’s Stage 7 Hall, Oran Park, is a multipurpose hall structure. St. Benedict’s Catholic College was opened in 2011 on a greenfield site in Sydney’s south west suburb of Oran Park. There are seven stages of construction work listed below. Technology and Applied Studies (TAS) food technology covered outdoor learning science staff…
-
Bega Tafe – Stage 2
Raj (Arokiaraj Arputharaj) Bega Tafe-Stage 2 structure is Multi Trades Hub. The new 2-level Multi Trades Hub adjoins the existing TAFE NSW Connected Learning Centre and incorporates workshops for automotive, engineering, carpentry, and bricklaying disciplines. Also included are general learning spaces, specialist facilities that support the delivery of aged care, disability courses, and early childcare,…
-
4 Schofield St, Essendon
Raj (Arokiaraj Arputharaj) 4 Schofield Street is a multi-residential development structure. The structure contained five dwellings. TEK1 raised multiple RFIs with a proposal. So the design got revised according to the RFIs. The client responded to TEK1 RFIs quickly. The project was completed quickly by our team.