When issued for Fabrication drawings go on Hold for whatever reason.
Things to note.
- Drawings issued for fabrication will be in a work flow. We have no control on where all these drawings have gone.
- The only thing we can do is introduce a new revision for the drawing into the work flow with a new Revision No – DO NOT FABRICATE – DRAWING ON HOLD
- Put a STAMP across the drawing. DRAWING ON HOLD
- In the revision col, the revision discription should “Do Not Fabricate”
- Take a drawing List report which has the revision Mark and Revision description. (Do Not Fabricate)
Leave a Reply