Tek1 has successfully completed the industrial project for the reputed organisation in Australia .
We have provided a ceiling support steel for the tunnel road. One of the main challenges we faced in this project was site measurement. We had to provide frames between two walls, and modeling using design dimensions was not feasible.
As a result, we decided to model all of the frames using the site measurements. We received measurements of the rock surface which was uneven, so we had to calculate the face-to-face dimensions for each frame and then proceed with the modeling process.
We are thrilled to announce that this project has been successfully completed without any errors!
Leave a Reply