Cause
* During lifting
* During Transportation
* During Erection
* After erection & slab pouring
Problem
* where the cracking of panel further affected the waterproofing by damaging the internal stud walls of the building.
* Reinforcement getting Weak
* If any interior work will damage due to the weather proof issue.
Remedies
* Get concentrate those location & intimate to reinforce team for additional reinforcement
* Insist to follow the Guidelines from the engineering team
* Insist Factory to concern the reinforcement for the specific openings
* Insist Factory & Erection Crew to Follow the standards & guide line when the lifting from the store, during transport & installation the panel
* During transportation take care all panels sitting on ‘A’ frame to be vertically supported on 2 points & if any additional support should only be for lateral purposes. Insist to follow the transportation guidelines
* The Grouting must be taken care on time for the panel with openings Coordinators to advise if any special cases if needed.