Lot 202, Mount Keira Road, Mount Keira

About:

  • A Two-story dwelling.
  • Roof truss: 9m-long sloped ceiling.

Problems Solved:

  • Utilized a panel roofing system for the overhang to match the truss roofing system.
  • Conducted precise truss engineering analysis using the Scottsdale 700mm machine series.
  • Included point load calculations to determine upward and downward load transfers from the roof to the floor.
  • Incorporated a set-down in the floor joist to accommodate the bathtub and calculated its load-bearing capacity.
  • Proposed the reduction of structural steel, which was approved by the engineer.
  • Designed wall cutouts and tolerances for accessing the steel column base plate within the slab.

Project Highlights

Designed wall cutouts and tolerances for accessing the steel column base plate within the slab

Incorporated a set-down in the floor joist to accommodate the bathtub and calculated its load-bearing capacity

Produced precise slab drawings with details based on the LGS model

project gallery