Lot 57, Sturdee Street, NSW

About:

  • two-story residential building in Sturdee Street, Towradgi NSW
  • We cut eliminated steel beams and replaced them with LGS joists and columns in order to cut costs. We proposed a design which our approved.
  • To facilitate proper load transfer from top to bottom, we organized the floor trusses and roof trusses with a uniform spacing, which also aided in minimizing the use of steel.
  • This project encompasses 9595 meter of light gauge steel roll former, comprising 11.5 tons of steel.

Project highlights

We proposed a design change to replace a concrete column for an external planter box with a double-wall LGS column.

Subsequently, the client approved the proposed change and also opted to replace the concrete planter box with an LGS planter box.

We provided an exclusive floor joist layout and detailed views for critical areas.
To avoid error during installation.